Project Overview: Fisherman's Friend, Fleetwood
Fit-out of new 3,000m² manufacturing and packaging facility to increase the current output of 5 billion lozenges per year. The project included the formation of 9 new ISO 8 class cells requiring temperature and humidity control together with cascade pressure differentials between open product cells, transient corridors and change facilities.
Hurstwood undertook the validation for the project including the preparation of the Installation Qualification (IQ) and the Operational Qualification (OQ) chronicling the Mechanical Services Installation sought for the premises and confirming that they were in accordance with Fishermans Friends requirements for production, storage and distribution of products.
Project Team
Client -Fisherman's Friend
Main Contractor -JVX Ltd
Architect -R Bolton
Mech Contractor - J Fletcher (Engineers) Ltd
Elec Contractor - DB Electrical Ltd
Quantity Surveyor - JVX Ltd
Project Value
MEP Services £5.2M
Service
Air Conditioning
HEPA Filtration
Local Extract Ventilation
Compressed Air
BMS
Data Logging
Validation
Fire Alarm, Security, Disabled Alarm and PA
Lighting, LV Power Systems